Green hydrogen - produced using the electrolysis of water with renewable energy - is a key cornerstone on the road to climate neutrality. To achieve this, Europe is currently following ambitious plans to expand production capacities and infrastructure. The challenge is to establish a clean hydrogen production while at the same time conserving water resources.

Long-term planning security
Herco offers you a reliable supply of ultrapure water in consistent quality for electrolysis and at the same time minimises water and energy consumption in water treatment.

Sustainable solutions for electrolysis

At our site in Freiberg am Neckar, we develop and manufacture high-quality water treatment systems for pilot projects, large-scale projects and mobile container solutions. Thanks to our decades of experience in water treatment, we guarantee fast and worriless installation on site. We rely on particularly durable systems.

Top quality is sustainable
In the production process, an optimised technical design extends the service life of the electrolyser. We offer future-proof water treatment which also significantly reduces your operating costs (more on operational expenditures in our case study) using pumps with frequency converters and an integrated concentrate stage.

A man in a white shirt stands against a blue background, representing a manufacturer of water treatment systems.

High purity water extends the life of the electrolyser

"Foreign ions in the water such as iron reduce the cathode activity and thus reduce the performance of the electrolyser. At the same time, copper can increase membrane resistance."

Tugay Cerit, Product manager

Technology
Modular components for every step in the water treatment process

1. Pre-treatment

Filtration
Softening

2. Reverse osmosis

Reverse osmosis (UO)
Membrane degasser(MEG)
Electrodeionisation (EDI)

3. Storage and distribution

Pure water tank
Booster system
Mixed bed demineraliser
UV unit

4. Process water circuit

UV unit
Mixed bed demineraliser

A detailed diagram illustrates an industrial water treatment process, highlighting the integration of reverse osmosis systems.

Our portfolio
Flexible water treatment units

Our modular and scalable water treatment units are optimised for the hydrogen production. They cover all important steps: from pre-treatment, desalination and reverse osmosis to water storage and distribution.

Due to our extensive expertise in hydrogen applications, we develop high-quality solutions (pilot, frame and container projects) that are precisely tailored to the requirements of the electrolyser during hydrogen production .

Our solutions

  • Pilot project

  • Frame unit

  • Container system

Two professionals discuss water technology plans, showcasing Germany's excellence in industrial water treatment.

Efficient in-house engineering
Customised water treatment systems

Whether standard or customised systems - we combine proven components that are either directly available or manufactured in our facility in Freiberg am Neckar. We can supply you with standard systems up to 30 m³/h immediately; larger systems can also be realised as special systems. We would be happy to plan these together with you.

With our UP (Ultrapure) series, we offer you water treatment systems for electrolysers with an output of up to 100 MW used for hydrogen production - all from a single source. Our sustainable and durable UP series is suitable for the production of green hydrogen from well water, process water, surface water, drinking water and seawater - with suitable pre-treatment.

 

The Herco Sonderanlage UP 2000 PP is a sophisticated reverse osmosis system for industrial water treatment.

Case study customised system

Output and electrolysis technology
100 MW AEL

Unit technology

  • Dosing system for antiscalant
  • Permeate-staged reverse osmosis with electrodeionisation (20 m³/h diluate capacity)
  • Membrane degassing system with side channel compressor

Premium quality that makes a difference

  • Solution orientated engineering

    Flexible design according to your individual wishes and requirements (customised standards).

  • Comprehensive project management

    Fast implementation of your project from standard to special solutions.

  • Plug & produce
    systems

    The system is tested thoroughly before delivery in the company's own test centre.

  • Sustainable water treatment

    Low water and energy consumption thanks to FU pump and KR.

References
Selection of our scalable and proven water treatment systems

A green world map highlights Herco's global impact in industrial water treatment and green hydrogen projects.

UP-Container system for 20 MW (AEL)
Customer: Electrolyser manufacture, Germany

UP-Frame unit for 5 MW (PEM)
Customer: Electrolyser manufacturer, Germany

UP-Frame unit for 3 MW (AEL)
Customer: Electrolyser manufacturer, Germany

UO-Frame unit for 1 MW (AEL)
Customer: Electrolyser manufacturer, The Netherlands

UP-Container system (PEM)
Customer: Stack manufacturer, Germany

Container reference
Ultrapure water system for testing PEM stacks

REQUIREMENT
Development and construction of a complete containerised ultrapure water system for testing PEM stacks within a tight timeframe of less than 20 weeks.

SOLUTION
Herco supplies a ready-to-use solution in a 40-foot high cube container. The system has been specially tailored to the requirements of PEM stack testing and provides reliable ultrapure water treatment at the highest level.

SYSTEM TECHNOLOGY

  • 40‘ high-cube-container
  • Double softener
  • Permeate stage ultrapure water system consisting of two
    reverse osmosis stages and one electrodeionisation stage
  • Ultrapure water tank made of polypropylene
  • UV system for the reduction of TOC
  • Polisher
  • IR-welded pipework

RESULT
The solution guarantees a reliable ultrapure water supply with state-of-the-art technologies. Thanks to IR welding technology, an outstanding material and process quality was achieved.

Year
2024/25

Country
Germany

Customer
Electrolyser manufacturer Germany

Branch
Hydrogen

 

Reference project for a 20 MW AEL electrolyser
High-quality container system for the provision of ultrapure water for the production of green hydrogen

Performance and electrolysis technology
20 MW AEL

System technology

  • 2x 40‘ high-cube-container incl. fixtures and painting (C5 and C4)
  • 5,8 m³ feedwater tank
  • Dual pressure booster system
  • Sand filter
  • Activated carbon filter
  • Dosing stations
  • Permeate-staged reverse osmosis with electrodeionisation (4.5 m³/h diluate capacity)
  • 35 m³ diluate tank with nitrogen overlay
  • UV unit with polisher

Application
For the production of green hydrogen

Customer
Electrolyser manufacturer, Germany

Reference project
Pilot project for 5 MW PEM elektrolyser

A reverse osmosis system for industrial water treatment, featuring complex piping and control panels, showcases advanced engineering.

Customer
Elektrolyser manufacturer, Germany

Performance and electrolysis technology
5 MW PEM

Unit technology

  • Double softening system
  • Reverse osmosis with electrodeionisation (1.5 m³/h diulat capacity)

Reference project
Pilot project for 3 MW PEM elektrolyser

A Herco water treatment system is displayed, showcasing advanced technology for reverse osmosis in industrial water treatment.

Customer
Elektrolyser manufacturer, Germany

Performance and electrolysis technology
3 MW PEM

Unit technology

  • Dual pressure booster system
  • Reverse osmosis (0.9 m³/h permeate capacity)
  • Mixed bed demineraliser with UP resin
  • Permeate tank
  • Pressure booster system

Reference project
Frame unit for 3 MW AEL electrolyser

A Herco elektrolyse water treatment system is shown, highlighting industrial water treatment technology.

Customer
Electrolyser manufacturer, Germany

Performance and electrolysis technology
3 MW AEL

Unit technology

  • Antiscalant dosing
  • Reverse osmosis with electrodeionisation (800 l/h diluate capacity)
  • Diluate tank

Questions and answers on the subject of water treatment and electrolysis

What is the connection between water treatment and electrolysis?

During electrolysis, water is split into hydrogen and oxygen. Precisely defined water quality is required for the process to run efficiently and safely. Water treatment ensures that dissolved salts, particles and organic substances are removed in order to extend the service life of the electrolysis cells and minimise energy consumption.

Which treatment steps are necessary before electrolysis?

Typically, several processes are used - such as filtration, softening, reverse osmosis and EDI (electrodeionisation). This combination ensures that the feed water fulfils the high quality requirements for electrolysis. Herco develops modular and compact systems that are precisely customised to the respective process.

How does efficient water treatment contribute to the economic efficiency of electrolysis?

An optimised water circuit reduces maintenance work, minimises downtimes and lowers operating costs. In addition, the energy required for electrolysis is reduced, as pure electrolytes have a higher conductivity and the process is therefore more efficient.

Why is water quality so important for hydrogen production?

Impurities in the water can damage the electrolyser and significantly reduce the hydrogen yield. High-quality water treatment protects the electrolysis system from deposits and corrosion and ensures the constant production of high-purity hydrogen.

What are the advantages of hydrogen processing with Herco?

Herco offers customised systems for hydrogen processing with high operational reliability and a long service life. Thanks to space-saving containerised construction and efficient system design, sustainable solutions are created for reliable hydrogen production.

Downloads

Product Portfolio 2026: Ultrapure water systems

Our water treatment systems – including those for the production of ultrapure water – can be found from page 40 onwards in our complete product catalogue.

File format:
PDF / 3.5 MB

Case study: 25% Lower Operating Costs

Case study on reducing OPEX and achieving payback within just two years – through the use of efficient water treatment with KR, based on an example from the green hydrogen industry.

File format:
PDF / 2.4 MB

Three water droplets in black, red, and yellow symbolize German engineering in industrial water treatment by hercowater.

Made in Germany
We produce in Germany

We have many years of experience in plant construction, including complex projects. Quality ‘Made in Germany’, engineering spirit and adherence to deadlines are our top priorities. Our employees test our high-quality products in our in-house test field to ensure that they work perfectly - with factory acceptance and training on request.

The image displays the EMAS environmental management logo, showcasing the commitment of hercowater to sustainable industrial water treatment.

Environmental management system
First EMAS-certified plant manufacturer in the water treatment sector

Herco Wassertechnik GmbH applies an environmental management system in accordance with Regulation (EC) No. 1221/2009 and EN ISO 14001:2015 (sections 4 to 10) for the continuous improvement of its environmental performance, regularly publishes an environmental statement, has the environmental management system and the environmental statement verified by an accredited, independent environmental verifier and is registered in the EMAS register (emas-register.de).

Feel free to sign up for our newsletter
All company news at a glance

By registering, I agree to receive the Herco newsletter with information and offers by email. My usage behavior will be evaluated for analysis and optimization purposes. I can revoke my consent at any time. Further information can be found in our privacy policy.
A smiling employee in a suit represents HercoWater, a leader in industrial water treatment solutions.
Info & Advice

Are you interested in our solutions?

Please select how we can help you. If you have any further questions, please contact us directly at any time.

Request a consultation

Request a consultation

Non-binding on your desired date

Request a quote

Request a quote

Directly by e-mail

Please feel free to contact me directly

Cesar Pinto
Business Development Manager Hydrogen

cesar.pinto@hercowater.com
Response within 24 hours

+49 (0) 7141 7095 134
Mon-Fri 9:00 - 17:00

LinkedIn

Request a consultation

Please let us know your topic and the desired date so that we can prepare your consultation in the best possible way.

How may we advise you?
Please add 1 and 5.

Quotation for a water treatment plant

To prepare a quotation, please provide us with all the data and values you know about your project.

Your data

Your requirements

Is CIP cleaning necessary?*
Is hot water sanitisation of the system necessary?*

Which media are available?

Voltage and frequency

Compressed air

Sensors
Is communication with a control system to be provided?
Contribution by HERCO?*

Untreated water values

Untreated water analysis available*

Enter untreated water values or upload here

Cations

Anions

Sonstiges

Target water values

Do you know the values of your target water?**

Cations

Anions

Other

What is the sum of 4 and 2?